/
RSS Feed
Interview: Justin Kringstad, director, North Dakota Pipeline Authority
Kringstad discusses the future of refracs in the Bakken as well as explains the basic science behind it. He also relays some information from the Western Dakota Energy Association’s annual meeting, where he was a panel moderator and presentor.
Technology is discusses in detail and how the Bakken is still in its infant stages with generations of drilling left.
Kringstad gives an update on the pipeline infrastructure and opines on North Dakota Governor’s challenge to the energy industry of 2 million barrels, zero spills and coal collaboration.